Rehabilitation of the Victoriaville cycle path

  • Site Jutras Boulevard, Victoriaville
  • Product Permavoid 150HD
  • Contractor Excavations Tourigny
Multi-purpose track, the installation of a Permavoid 150 stormwater retention system on a localized section. The track and its slope directed surface water to a specific location. With the Permavoid 150 we managed the water directly under the track with little depth and maintained the structural integrity of the path.

Communicate with usEstimation - Advice